REFERENCES OF LLC "SCIENTIFIC AND PRODUCTION ASSOCIATION "RAKURS"


 

No.

Name of the object

Design stage

Implementation period

1

LLC "Atlas Copco". The reconstruction of the workshop with the installation of the crane beam with a 16 tons carrying capacity

Detail engineering

March-May 2016

2

ERG. SSGPO JSC (Kazakhstan). Development of technology and technological solutions for the reconstruction of the beneficiation plant with a productivity of 45 million tons per year

The preliminary feasibility study that provided 3D model plant

August-October 2016

3

State enterprise "Boryspil international airport". Reconstruction of tanks VST-1000 No. 1,2,3 and RVS-2000 # 4 and # 5

Architectural supervision

September-December 2016

4

Metholding. JSC "KMAruda" (Russia). Development of technology for beneficiation of magnetite quartzites. Construction of the beneficiation plant with a productivity of 7.0 million tons per year for the initial ore

The preliminary feasibility study that provided a 3D model of the factory in 2 version

October 2016-February 2017

5

LLC "Rudomine" (Krivoy Rog). Development of technological regulations of beneficiation of off-grade ores of the Krivoy Rog iron ore basin

Research

February 2017

6

Ferrexpo AG. СJSC "Poltava Mining". Beneficiation plant No.2. The construction of section No. 16. The performance of the 5.6 million tons per year of original ore

Development of technological regulations, feasibility study

March-October 2017

7

LLC 'Shimanovskoe steel'.  Analytical review of the ore processing Shimanovskoe deposits on the mining companies of Ukraine

Research

April 2017

8

Ferrexpo AG. СJSC "Poltava Mining". Pelletizing plant. Technological line #1 and #4. Reconstruction of the pelletizing area to increase productivity to 6.5 million tons / year for finished pellets

Pre-project studies

June 2017

9

Ferrexpo AG. СJSC "Poltava Mining". Pelletizing plant. Technological line #1 installation of an additional crane beam

Pre-project studies

July 2017

10

Ferrexpo AG. СJSC "Poltava Mining". Pelletizing plant. Reconstruction of the pelletizing area to ensure industrial research of the pelletizer disk with a diameter of 7.5 m

Pre-project studies

December 2017-January 2018

11

Ferrexpo AG. СJSC "Poltava Mining". Pelletizing plant. Construction building of press-filtration productivity of 28.6 million tons per year of dewatered concentrate with the charge preparation area

Feasibility study, design and detailed engineering

September 2017 – September 2018

12

Regional municipal production enterprise "Dnipro-Kirovohrad". Reconstruction of sewage pumping stations (20 objects)

The project and detailed engineering. Inspection of building structures.

November 2017-October 2018

13

LLC "Rudomine" (Krivoy Rog). Development of technological regulations for the beneficiation of hematite quartzite mine Of Kirov (the field of the Artem mine) using the technology of dry magnetic separation for recovery of commercial production

Laboratory research

December 2017-February 2018

14

State enterprise "Kryvyi Rih international airport". Installation of block transformer station 6/0.4 kV.

Detail engineering

January 2018-March 2018

15

Ferrexpo AG. СJSC "Poltava Mining". Building a press filtration casing. Calculation of short-circuit currents and settings

Detail engineering

April 2018-June 2018

16

Ferrexpo AG. СJSC "Poltava Mining". The 9th section. Power supply 6 kV

Detail engineering. Correction

May 2018-August 2018

17

Ferrexpo AG. СJSC "Poltava Mining". Pelletizing plant. Technological line #2. Installation of the leveling wall with replacement of the smoke exhauster and its strapping

Detail engineering

May 2018-July 2018

18

Ferrexpo AG. СJSC "Poltava Mining". Pelletizing plant. Technological line #1. Reconstruction in order to increase the productivity from 3.0 to 6.5 million tons/year of fired pellets

Feasibility study

August 2018-February 2019

19

Metinvest. СJSC «Central GOK». Pelletizing plant. Reconstruction of the section for sorting of fired pellets in order to exclude the class +16.0 mm from the fired pellets

Detail engineering

June 2018 –August 2018

20

Metinvest. СJSC «Central GOK». Pelletizing plant. Installation of the pelletizing disk SCARABEUS 7500 instead of existing on the technological line № 74

Detail engineering

July 2018 –September 2018

21

Metinvest. СJSC «Inguletskiy GOK». Crushing plant. Case 3-4 stage crushing. Reconstruction of the oil lubrication section

Detail engineering

April 2018 –September 2018

22

Ferrexpo AG. СJSC "Poltava Mining". Laboratory and pilot scale tests on the pelletizing of concentrates "Premium" and "Premium+" at laboratory of HAVER Engineering GmbH

Research

April 2018-August 2018

23

Metalloinvest. JSC "Lebedinsky GOK" (Russia). Pelletizing plant. The firing building No.2. Reconstruction of the system of flow-transport system of firing machines

Supervision, development. Detail engineering

January 2018 –October 2018

24

Metinvest. СJSC «Central GOK». Reconstruction of repair and mechanical equipment facilities

Detail engineering

September – December 2018

25

Ferrexpo AG. СJSC "Poltava Mining". Construction of the press-filtration building. Transfer of drainage pumps from the construction area of the press-filtration building

Detail engineering

September-November 2018